Temporary bridge open in Port Bruce

Featured image for "Temporary bridge open in Port Bruce"

bridgeThe temporary panel bridge connecting the north and south sides of the lakeside village of Port Bruce opened to traffic at about 10:55 a.m. on Monday, Aug. 20. In this photo taken at about 11:45 a.m. that day, a car is seen completing a north-south crossing of the bridge that spans Catfish Creek from Bank Street on the north side to Dexter Line on the south side. (AE/Craig Bradford)